Showing
61 - 80
of 433
, query time: 0.01s
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Spiral stariway shaft is seen in foreground. Outlet conduit is completely covered.
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1).
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1).
Format:
Image
Panorama of damsite looking upstream from a point on right abutment about 1/4 mile downstream from dam. (Photographic point No. 2). Refer to Pine R - 112 a&b (D003007).
Format:
Image
Panorama of damsite looking upstream from a point on right abutment about 1/4 mile downstream from dam. (Photographic point No. 2). See Pine R - 25 a&b (D003006).
Format:
Image
General view of camp constructed by the Martin Wunderlich Co. The three large buildings at the left are the commissary, mess hall and office.
Format:
Image
Panorama of damsite looking upstream from point on right about 1/4 mile downstream from dam.
Format:
Image
View of portion of government camp. Two-room temporary residences.
Format:
Image
View of 2-room duplex residences built by Martin Wunderlich Co.
Format:
Image
View of government camp and contractor's camp from mountain on South side of valley. Contractor's camp to the left, government camp in center, and Vallecito Dam at extreme right. Note temporary diversion channel and log crib drop in lower right hand corner.
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment.
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Cross-cut in foreground is excavation for the outlet conduit.
Format:
Image
View of portion of government camp. Beginning at right side buildings are: permanent residence, office, and four temporary residences.
Format:
Image
Damsite after stripping - Looking along axis of dam toward left abutment from centerline of spillway. (Photographic point No. 1). Double line of stakes seen in foreground are slope stakes for outlet conduit excavation.
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment. Large stakes define different sections of the embankment.
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Format:
Image
View of hand-tamping operations around outlet conduit, taken fro the top of the left bank opposite outlet works station 8+85. Note embankment cut-off wall in left background.
Format:
Image
Close-up of hand-tamping operations in backfilling along the outlet conduit from works station 9+25.
Format:
Image
Placing reinforcement steel in section of outlet conduit.