Showing 81 - 100 of 433 , query time: 0.01s
Cover Image
Format:
Image
Dumped riprap on upstream face of embankment in the vicinity of station 20+00.
Cover Image
Format:
Image
Twelve yard Euclid bottom-dump truck dumping material on the upstream No. 2 section of the embankment at sta. 24+84. this material is approximately 1.5% below optimum moisture. Note the excellent condition of the embankment for truck travel.
Cover Image
Format:
Image
Dumping riprap from bottom dump Euclid near the top of existing embankment.
Cover Image
Format:
Image
Looking along axis towards centerline of spillway from an elevated position over the right bank.
Cover Image
Format:
Image
Eighteen yard Euclid bottom dump truck in operation hauling No. 1 material. Note that tires are on surface during full load conditions. Truck at 23+40 on extreme upstream edge of fill.
Cover Image
Format:
Image
Material seen in foreground shows the type of material that is being placed in the 18-inch filter blanket at downstream toe of dam. Cobbles are in the cobble-fill section.
Cover Image
Format:
Image
Excavating and loading rock at borrow pit for dumped riprap on upstream slope of embankment.
Cover Image
Format:
Image
Excavating clay in Borrow Pit No. 1, station 121+50/61+75. Cut is about 9 feet.
Cover Image
Format:
Image
Excavating in bedrock at upstream right hand corner of trashrack structure.
Cover Image
Format:
Image
Excavating rock for foundation for the trashrack structure.
Cover Image
Format:
Image
Excavating sand for concrete. Borrow pit is about one mile upstream from dam.
Cover Image
Format:
Image
Excavation for outlet conduit, looking downstream from station 6+00. Bulldozer in foreground is cleaning off bedrock.
Cover Image
Format:
Image
Excavation to bedrock for placing lean mass concrete foundation under spillway inlet wall at left side, station 5+30 and 5+84. End of embankment cut-off wall placed in 1938 is seen in foreground. Refer to Pine R - 310.
Cover Image
Format:
Image
Looking toward right abutment from axis sta. 7+75. Le Tourneaus are seen excavating additional cut-off trench in center of picture, and placing the material directly into the fill in the old river channel in the foreground.
Cover Image
Format:
Image
Looking toward left abutment from sta. 20+00. Additional cut-off trench excavation in foreground. Refer to Pine R - 167.
Cover Image
Format:
Image
Excavating additional cut-off trench. Looking toward left abutment from axis at sta. 20+00. Refer to Pine R - 167 and 171.
Cover Image
Format:
Image
Excavating additional cut-off trench through embankment placed in 1938. Taken from point 25 feet upstream from dam axis at station 17+00.
Cover Image
Format:
Image
Excavation for additional cut-off trench, looking toward left abutment from axis sta. 14+90. Excavation is practically complete. Junction with secondary cut-off is at rear end of shovel. Refer to Pine R - 183.
Cover Image
Format:
Image
Excavation of additional cut-off trench looking toward right abutment from axis sta. 16+50. Right side of cut is in primary cut-off trench placed in 1938. Shovel is working in original foundation material. Refer to Pine R - 182.
Cover Image
Format:
Image
Excavation for additional cut-off trench, looking toward right abutment from axis station 16+75. Excavation is complete and bottom of trench is a minimum of 6 ft. into glacial till. Refer to Pine R - 188.