Archive Search Results
Showing
161 - 180
of 255
, query time: 0.01s
163. Bill Williams
Format:
Image
Tom Reed repairing a foot valve for one of the pumps which pumped water from the mine. The ever present miner's lunch bucket is in the background on the floor. Most miners used the same lunch bucket for many years until it became too dented to close. It was often hammered back or bent back into shape.
168. Machine Shop
169. Shaft house
Format:
Image
Steve Rich unloading mining timber at the bottom of the main shaft, level 16. The mining timbers were loaded vertically by the surface crew to fit the main cage that transported them down into the mine. A timber truck can be seen in the foreground and a "stern" warning sign is in the background.
172. Timber cars
173. Loading mine timbers
175. Main cage
176. Cyanide mixing
180. Tamping dynamite
Format:
Image
Tamping in dynamite prior to blasting a section at Gilman. Holes that have been prepared are shown with electrical connections to the blasting caps and the dynamite. Joe Fear prepared the blasting caps on the surface. Bottom series of holes were detonated first to keep the miners from having to work so much loose debris - a true demonstration of the principle of gravity.