Archive Search Results


Showing 261 - 270 of 270 , query time: 0.01s
Thumbnail for 'Emmet Flaherty heating steel'
Format:
Image
Emmet Flaherty preparing to pre-heat two blank pieces of hollow drill steel. In the background is an automatic oil-fired forge which will bring these blanks to an exact temperature for forging. From the hollow drill blanks, finished pieces of lugged steel are formed for use in rock drills.
Thumbnail for 'Installing new dryer'
Format:
Image
Team installing a new dryer at the New Jersey Zinc Co. facilities at Belden. From Left: Don Ginther, Lynn Walker, [unknown], Homer Sultzer, Buck Hickman, Forrest Witthauer. [Courtesy of Theodore Beck]

263. Gilman

Thumbnail for 'Gilman'
Format:
Image
The town of Gilman taken in autumn of 1959. The Eagle Mine is located below the town and covered by trees.

264. Gilman

Thumbnail for 'Gilman'
Format:
Image
The town of Gilman in autumn of 1959. The Eagle Mine can be seen below and to the left in the Eagle River Canyon.
Thumbnail for 'Compressor room at Belden'
Format:
Image
Harold Steinmeyer (left) and Bill May in the compressor room at Belden. Prior to the electrical power plant at Gilman, much of the electricity for the mine (compressors) was supplied by the use of Pelton wheels (turbines) powered by the water from Fall Creek at Belden.
Thumbnail for 'Tailings pond'
Format:
Image
The tailings pond below Gilman (south east of Maloit Park). Mine wastes were piped approximately four miles down into the settlement area. The tailings pond kept mine wastes from flowing into the Eagle River.
Thumbnail for 'Drills and lathes'
Format:
Image
Drills and lathes in the repair area. Welders and machinists were employed by New Jersey Zinc to maintain and recycle equipment. During the 1950s, there were three shifts working each day to maintain production levels.
Thumbnail for 'Unloading zinc from dryer'
Format:
Image
Conveyor unloading zinc from the dryer at Belden. The zinc was then taken to the loading tippel to be loaded on railcars. Durbin McIlnay is monitoring the process.
Thumbnail for 'Tailings pipe maintenance'
Format:
Image
Tearing down the existing tailings pipe and stands at the tailings pond below Gilman. Once enough sediment had been released through the bottom of the pipe, new stands were erected to lift the pipe to a higher elevation. Harv Collins is in the center of the photo wearing light colored coveralls.
Thumbnail for 'New tailings pipe section'
Format:
Image
New section of pipe and stands for the tailings pond. Trusses with new sections of pipe are being built. Later a safety cable was added along a catwalk , which was used by employees to remove the plugs in the pipe and drain the tailings. Tailings were piped from Gilman as a slurry and, as the slurry dried, it became the same consistency as a fine sand.