Archive Search Results


Showing 21 - 40 of 439 , query time: 0.41s
Thumbnail for 'Looking across river channel toward right abutment'
Format:
Image
Looking across river channel toward right abutment from station 6+75. Timbering in test pit No. 11 is seen in partially excavated cut-off trench. Note sand deposits on each bank of the river.
Thumbnail for 'Panorama of river channel (1) (left)'
Format:
Image
Panorama of river channel looking downstream from top of cofferdam at sta. 11+30. Cut-off trench excavation in foreground. Note sand deposits on each bank of river.
Thumbnail for 'Panorama of left abutment (right)'
Format:
Image
Panorama of left abutment after clearing and stripping. Dragline is cleaning up preparatory to placing embankment in permanent cofferdam. Embankment seen in 82a is temporary cofferdam from waste material. Gravelly material on left bank is being used in inverted filter. Tripod supports sump pump. Taken from point 300 feet upstream from station 13+00.
Thumbnail for 'View of right abutment along permanent cofferdam'
Format:
Image
Looking across top of permanent cofferdam toward right abutment showing progress of filling the space between the two cofferdams. Refer to Pine R - 104.
Thumbnail for 'View of right abutment bedrock before excavating'
Format:
Image
Bedrock in cutoff trench at right abutment as it looked when first exposed and before any rock excavations were done.
Thumbnail for 'Spreading material between cofferdams'
Format:
Image
Le Tourneau and bulldozer spreading waste material between temporary and permanent cofferdams.
Thumbnail for 'Panorama of river channel (2) (right)'
Format:
Image
Panorama of river channel looking downstream from the top of the cofferdam, station 11+25, showing sand deposit to the right and left of river channel. Refer to Pine R - 120 a, b, & c.
Thumbnail for 'Close-up of sand deposits (1)'
Format:
Image
Close-up of sand deposits in cut-off trench on the left bank of the river channel.
Thumbnail for 'Looking upstream from top of embankment'
Format:
Image
Looking upstream from top of embankment at sta. 1+00. The slope at left foreground is ready for riprap. Note shoulder at right where riprap abuts the road ramp constructed by the contractor, which will be left to form a blanket at the left abutment.
Thumbnail for 'Placing dumped riprap on upstream slope of embankment'
Format:
Image
Placing dumped riprap on upstream slope of embankment in vicinity of sta. 33+00. Dragline is being used to grade material to the required slope.
Thumbnail for 'Looking along upstream slope of dam'
Format:
Image
Looking along upstream slope of dam from station 2+00 toward right abutment . Some hand placing is being done, to bring the riprap to grade. Note stockpile of riprap along crest of dam for use after parapet wall is placed.
Thumbnail for 'Looking downstream from point on right side of river (2)'
Format:
Image
Looking downstream in river section from point on waste pipe on right side of river. End of left half of the permanent cofferdam is seen back of the tripod. Refer to Pine R - 83.
Thumbnail for 'Looking downstream from point on right side of river (1)'
Format:
Image
Looking downstream in river section from point on waste pipe on right side of river. Foundation for a portion of the cofferdam is seen at extreme left.
Thumbnail for 'Looking toward left abutment'
Format:
Image
Looking toward left abutment from sta. 14+60 in cut-off trench. Excavation for trench across the river is complete and ready for refilling.
Thumbnail for 'Looking toward right abutment'
Format:
Image
Looking toward right abutment in bottom of cut-off trench from sta. 8+50. Dragline is removing timbers from Test Pit No. 11.
Thumbnail for 'View of cofferdam'
Format:
Image
View of cofferdam looking upstream from a point 115 feet downstream from axis at station 13+00.
Thumbnail for 'View from opposite station of left abutment'
Format:
Image
View from opposite station 16+00 looking toward left abutment. The partially excavated secondary cut-off trench is seen in the distance. The primary cut-off trench is in the middle background.
Thumbnail for 'View of right abutment along upstream cofferdam face'
Format:
Image
Looking along the upstream face of the permanent cofferdam toward the right abutment. The trucks and Le Tourneaus are on top of the temporary cofferdam, wasting sand from embankment stripping to fill the spade between the two dams.
Thumbnail for 'Looking toward left abutment (1)'
Format:
Image
Looking toward left abutment along alignment of secondary cut-off trench from axis station 16+00. The trench has been refilled with compacted embankment in foreground.
Thumbnail for 'Looking toward left abutment (3)'
Format:
Image
Looking toward left abutment from station 16+50. Placing impervious embankment in old river channel.